
POTSDAM -- Potsdam School District residents are invited to attend a building tour tonight at 6 p.m. at the elementary office.
The tour will be an opportunity to see the condition of the school and learn about the proposed $18 million capital project. Residents will vote on the project Dec. 12.
A public hearing on the proposal will be held Dec. 3 in the Potsdam High School Library.
A summary list of the improvements follows:
Elementary School -- $3.1 million:
• Roof replacement
• Interior lighting replacement
• Replace food service equipment
• Replace carpeting in main office and second grade wing
• Fix ceiling by gym
Middle School -- $3 million:
• Interior lighting replacement
• Electrical distribution upgrades
• Reconstruct back parking lot, sidewalks and loading dock area
• Replace food service equipment
• Replace four exterior doors
• Minor re-roofing
High School -- $10.6 million:
• Siding and window replacement on 1929 wing from library to auditorium
• Roof replacement
• Heating distribution system replacement—convert steam to hot water
• Auditorium renovations to ceiling, flooring, and stage
• Interior lighting replacement
• Exterior door replacement
Other -- $1.3 million
• Bus Garage fuel tank replacement:
• Storm water management
• Parking lot improvements
• Roof replacement
• Fire Alarm System